Our Services: Custom swimming pool and spa design and construction
Every
pool builder will tell you that his methods are the best. You should
ask yourself, how did he come to these conclusions.” In a
few short months, Pleasure Pools will be 14 years old. We have subscribed
to the same simple philosophy for all of this time, based on my
18 previous years of experience. My experience is in contracting,
not sales or electrical installations. Our philosophy of construction
is as follows. It is certainly recommended reading for anyone that
is ready to spend thousands of dollars on a pool.
If you have any questions about the process of building an inground swimming pool or spa we invite you to contact us today via telephone at 1-866-842-8061 or via email at sales@pleasurepoolsno.com. We have a design office in Metairie as well as a pool showroom in Mandeville to better serve you.
WE DON'T EMPLOY
SUB-CONTRACTORS, WE EMPLOY CRAFTSMEN
First, let's explore the fallacy of the value of the “In-House”
craftsman. In this market, which is a very small market, there is
not enough work to retain an in-house “craftsman.” In
almost all cases, the in-house employee, out of necessity, becomes
a “Jack of all Trades”, and, as the axiom goes, “Master
of None.” We, by choice, employ craftsmen that are true craftsmen.
The men we employ, who will construct your pool, perform only one
craft. The excavators, only excavate, the steel-tyers only tie steel,
the tile and coping man, does only that. Some contractors feel that
they are saving money and expediting their work by employing in-house
craftsmen. In our opinion, they are not really saving money when
you consider all aspects of their employment. In addition, their
work is always sub-standard and they are less reliable than true
craftsmen.
WE HAVE TWO OFFICES THAT WE STAFF & MAINTAIN
Could we reduce our overhead and operate out of a pick-up truck, an apartment, or out of a home? Of course we could. Who would do the work that is presently performed by our Office Manager, Comptroller, Phase 1 Construction Supervisor, Phase 2 Construction Supervisor, Warehouse Manager, and Service Manager?
Pleasure Pools maintains an office in Metairie as well as a new pool showroom in Mandeville in order to better meet the needs of our clients and manage the pool construction process. We struggle every day to provide excellent service to our clients in terms of having a live body to talk to, answering questions, ordering materials and equipment, and supervising and inspecting our work. Who does this for the contractor without an office...No One!! The old axiom that “you get what you pay for” is certainly true here. We feel that the money we spend on “overhead” is money well spent, and it is spent to provide the best service we can to our clients.
ALL OF OUR POOL
EQUIPMENT COMES FROM ONE MANUFACTURER
Did you ever notice that some pool builders use one brand of pump,
one brand of filter, another brand of heater, etc. Do you know why
this equipment was selected? I would advance that in every instance,
the decision to buy that pump, or that filter was based on price.
If you go to the Jandy Pool Products web-site, you will see a noticeable
difference in QUALITY! This is why we purchase Jandy equipment.
It costs more, but, we have found that, across the board, it is
the best equipment available. It is also integrated electronically,
so that your electronic control system (included in your base price)
recognizes and properly controls all of your equipment.
ALL OF THEIR "UPGRADES" ARE STANDARD EQUIPMENT
You've seen the ads before, “POOL AND SPA, ONLY $29,995”,
and the qualifiers that follow, “Electrical extra, cleaner
extra, light extra, based on standard excavation, etc., etc. At
Pleasure Pools, we take the opposite approach. Our price will probably
be one of the highest you receive. It will also be the most complete
you will receive, in terms of the equipment we supply. Every pool
we install includes the following as “Standard” equipment:
Aqualink PDA Electronic programmer and controller
(hand-held)
AquaPure Salt Chlorinator
Jandy Stealth Pump
Oversided Jandy Cartridge filter
Polaris 280 Automatic Pool Cleaner
Jandy Color-Blend lights (choose your color or
“color-splash”)
All 2” Plumbing throughout, 2 Surface Skimmers,
no dead-spots
Jandy Never-Lube control valves
SUPERVISORS
FOR EACH PHASE OF CONSTRUCTION:
Pleasure Pools presently employs 2 superintendents that supervise
and inspect each phase of inground pool construction. They report daily to a “Scheduler”
who compiles their inspections and expedites the jobs by scheduling
new work, by issuing written work-orders, upon satisfactory completion
of the previous phase. The phases of work are as follows:
Phase #1. Pre-Site:
Layout of pool with superintendent and designer. Access, obstructions,
placement, and elevation will be explored. Outline of pool painted
on ground.
Phase#2. Excavation/Steel/Plumbing/Filter Placement:
Over one million dollars of equipment and approximately 25 employees
will be used to dig, reinforce, plumb and place your pool equipment.
This process will take 3-4 days on most occasions.
Phase #3. Gunite: Over one million dollars of equipment
and 10 employees will be used to create the structural shell of
your pool with “Gunite” which is pneumatically applied
concrete. This procedure will take one day, on most occasions.
Phase #4. Clean-Up #1: The form will be removed
from the gunite shell, and construction debris will be removed from
the site.
Phase #5. Tile and Coping: A crew of 5-6 craftsmen
will apply the water-line tile and coping on your pool. Walls will
be built and fountains installed.
Phase #6. Deck Preparation: The deck crew will
either form up (concrete) or install the base (pavers) for your
walkway around the pool.
Phase #7. Electrical: A certified electrician will
ground your pool (this is very important and HAS TO be done BEFORE
the deck is completed). This phase usually requires inspection and
there could be delays due to availability of inspectors.
Phase #8. Deck Installation: Your deck is installed.
This phase usually takes a long time, due to the fact that it is
in 3 parts, one involving inspection. Each is a part of the critical
path to the other.
Phase #9. Plaster: Your pool is cleaned, drained
and prepared for plaster on one day, and usually plastered or finished
on the interior within the next day or two. Your pool is filled
on this day.
Phase #10. Final Clean-Up: All construction debris
is removed.
Phase #11. Start-Up: A qualified technician will
report to your pool and place all of your equipment in operation.
This phase will usually take a week or longer. Your water will be
balanced chemically and your pool will be cleaned and maintained.
You should provide a hose to fill the pool, monitor the filling
(don’t turn the water off) and call when the pool is filled.
It is helpful if you brush the pool each day. We will provide the
pole and brush.
Phase #12. Pool School/Owner Orientation: The pool
is turned over to you in a professional manner. You are provided
with your tools, and verbal and written instructions on operation
and maintenance.
ALL EMPLOYEES WILL PERFORM WITH HONESTY & INTEGRITY
We can't absolutely control all of the actions of our employees,
but those that don't comply to the above, will not be employed very
long. Truthfulness in what we say and do is a requirement to work
at Pleasure Pools. Misrepresentation of anything is against our
policy. Many pools are sold by others by being less than honest,
and many pools are lost by Pleasure Pools by being honest with a
client. Experience has shown, however, that honest people, with
integrity, recognize and appreciate the same.
WE ARE FULLY INSURED, LICENSED, & WE PAY ALL TAXES & FEES
Most pool companies pay some, if not all of their employees as “sub-contractors.”
They do this to avoid payroll taxes. Some do not have a Louisiana
State Contractors License (Required for any contract over $50,000
by law). In order to maintain a State Contractors License, you have
Workmans Compensation Insurance. Dealing with a contractor with
this license insures that he has exhibited some level of competence
and he is insured. In short, we do things the right way. This, once
again, costs us more, but allows us to maintain our business structure
without changing our name every 5 years. |